UPN: 5157    Project Number: STPIP 17-1(10)11    Project Name: Milk River – North

T15 Base One Soil Stabilization image

The chosen soil stabilizer (SS) is Team Labs T15 Base One, a proprietary blend of Silicic Acid and Sodium Salt. Six test sections were installed on the project. A road reclaimer will be used for pavement reclamation and for the homogeneous mixing/injection of the SS. The SS application rate was set at 0.005 (0.5%) gallons per square yard per inch of reclamation depth.

Workplan
Updated Report

For more information, contact MDT Research Section.