What is happening on the Main Street Billings Project?
The Main Street Billings Project includes rehabilitation of approximately three miles of Main Street (US Hwy 312) in Billings. Project boundaries are from the intersection at 1st Avenue North on the southeast end to the intersection at US 287/Bench Boulevard on the northeast end.
The project includes a mill and overlay of the asphalt roadway, upgrading existing guardrail, replacement of signage and pavement markings, replacement of existing raised medians, upgrading of existing storm drain grates, construction of ADA compliant sidewalk corners, installation of accessible pedestrian signal push buttons, reflective tape on traffic signal heads and upgrading of traffic signal connectivity to a fiber optic system.
What is the project’s purpose and goal?
The purpose of the Main Street Billings Project is to maintain and improve the condition of the road, extending the service life and quality of Main Street through the Billings heights. The project will also improve overall safety by increasing ADA accessibility to the sidewalks and upgrading the existing signal systems in the project area.
What is the schedule for the project?
The Main Street Billings Project is scheduled for one construction season, beginning in the spring of 2021 and concluding in the fall/early winter of 2021.
Will this affect traffic?
Access to all intersecting streets, alleys, public, and private drives will remain open during construction. There will be temporary traffic control measures in place during intersection electrical work.
Traffic flow will be maintained with at least two lanes open for both directions of traffic during daytime/peak hours and at least one lane open in both directions during evening hours (8pm – 6am). When possible, paving work will be done during evening hours (8pm – 6am) to avoid more significant traffic impacts during peak daytime travel hours. Pedestrian access will also be maintained for the duration of the project.
What is the cost of this project?
The cost of the project is approximately 7.75 million dollars.
Where can I find more information?
The project website is https://www.mdt.mt.gov/pubinvolve/mainstreetbillings/
How can I ask questions, voice concerns, or leave comments?
Choose the method most convenient for you:
- A construction hotline is available at 800-748-7161
- Questions or comments may be submitted via email directly to the Public Information Officer, Becky Bey, at
- You may also get on a weekly construction update list by texting mainstbillings to 47177 (for weekly texts), or by emailing (for weekly emails)
- Mail:
KLJ
Attn: Billings Main Project
2969 Airport Road, Suite 1B
Helena, MT 59601-1201 - Call the Public Information Officer, Becky Bey, directly at 406-698-3668