Mulches (Hydraulic-SS3 , Straw-SS6, and
Wood-SS8)
Additional Considerations
n
Hydroseeding with hydromulch application is not
acceptable on MDT projects (SS3)
n
Availability of erosion control contractors may be
limited (SS6)
n
Availability of pneumatic blower trucks may be very
limited (SS8)