Construction and Maintenance Activity Report

Road Construction Report

View the construction map
          18-APR-14               MONTANA DEPARTMENT OF TRANSPORTATION  
          Report Name: RRSP0015         ROAD CONSTRUCTION REPORT
           
          For information please contact: Brandi Hamilton (406) 444-0468
           
          This is a report of road construction on Montana's interstates and major
          highways.  This report includes information available at the time of preparation.
           
          This report is available by telephone at 511 or 1-800-226-7623.  For the hearing
          impaired, call the TTY number 1-800-335-7592.  This report is also available on
          MDT's Traveler Information Web Site at www.mdt511.com.
           
          TRAFFIC FINES DOUBLE in highway work zones.  The law also set fines and jail
          sentences for reckless endangerment of highway workers.
           
          MINOR DELAYS (up to ten minutes) can be expected through these projects with
          anything over ten minutes being noted in the description.  Watch for equipment,
          flaggers, and workers along the road.  Expect reduced speed limits.
           
           
                                     ACTIVE CONSTRUCTION PROJECTS
           
          HWY 212  
          Mile Marker 64 to 70.5
                   Red Lodge 8th Street to Robinson.  Reconstruction work in progress.  
                   Work to begin April 22nd.
                   
           
          I-15  
          Mile Marker 121.1 to 121.1
                   Nissler Interchange Project on I-15/I-90.  Bridge work in progress.
                   There is a height restriction of 15 feet, a width restriction of 12
                   feet.  Expect reduced speed to 45 MPH, single lane closures.  Wide load
                   detour will be in place.  Wide loads over 12 feet taking I-15 south
                   will be staged at the Rocker Truck Stop, north side of the Interstate.
                   Wide loads over 12 feet on I-15 north will be staged at a lane closure
                   at milemarker 119.  Exit 219 south will be closed to wide loads. Also a
                   height restriction will be in place.  I-90 eastbound loads over 15' 4"
                   in height taking I-15 south will continue on I-90 East to Continental
                   Drive Interchange - exit 228 - 8 miles east of the Rocker Interchange
                   and then go back on I-90 West to stage at the Rocker Interchange.
                   Oversized loads will be piloted through the project Monday through
                   Thursday between 8:00 a.m. and 10:00 a.m. - each driver will have to
                   coordinate their arrival time with Keith Johnston of Mountain West
                   Traffic Control at 406-490-8390 at least 48 hours in advance of
                   arrival.  Tied with this project is the Silicon Mtn Tech Park & Port
                   project which begins at the I-15 junction with German Gulch Road. 
                   Watch for increased haul truck traffic in this area.
                   
           
          I-15  
          Mile Marker 192.1 to 193.3
                   Capital Interchange Bridge to the Cedar Street Interchange.  Surveying
                   work in progress. Expect single lane traffic, single lane closures. 
                   Beginning Monday April 21, northbound lanes will be closed from 7 a.m
                   to approximately 4 p.m.
                   Tuesday April 22  soundbound lanes will be closed 7 a.m to
                   approximately 4 p.m due to continued survey work.
                   
           
          I-15  
          Mile Marker 221.5 to 229
                   Wolf Creek Canyon.  Miscellaneous work in progress. There is a width
                   restriction of 14 feet.  Expect single lane closures.  Work is
                   scheduled to begin on Monday, April 14, 2014 and will take place Monday
                   thru Thursday between 7:00 AM - 4:30 PM. There will be a 14 foot width
                   restriction while work is in progress. Loads over 14 feet should choose
                   an alternate route during work hours. 
                   
                   Work in the northbound lanes will be complete by noon Thursday 4/17.
                   Work will continue in the southbound lanes and is expected to last
                   approximately one week.
                   
           
          I-90  
          Mile Marker 5.9 to 7.1
                   Taft Interchange East, approximately 7 miles east of the Montana -
                   Idaho border.  Rock work in progress. There is a width restriction of
                   12 feet.  Expect reduced speed to 35 MPH, single lane traffic.  Rock
                   Slide cleanup work is in progress.
                   
           
          I-90  
          Mile Marker 18 to 26
                   West of Drexel - Rock Fall Mitigation.  Miscellaneous work in progress.
                   There is a width restriction of 12 feet.  Expect detour, reduced speed
                   to 45 MPH, single lane traffic.  Rock fall mitigation efforts will
                   begin. Crews will be installing traffic control to detour westbound
                   traffic into the eastbound passing lane into two way traffic. Loads
                   over 12 feet wide will be restricted.
                   .
                   
           
          I-90  
          Mile Marker 51 to 55
                   Clark Fork River - Rehab East of Superior.  Bridge work in progress.
                   There is a width restriction of 12 feet.  Expect detour, reduced speed
                   to 45 MPH.  Bridge rehabilitation will begin. Crews will be installing
                   traffic control and constructing median crossovers. Watch for reduced
                   speeds, single lane closures, detours and two way traffic. Loads over
                   12 feet wide will be restricted.
                   
           
          I-90  
          Mile Marker 74 to 85
                   Alberton Interchange to Huson Interchange.  Bridge work in progress.
                   Expect reduced speed to 55 MPH, single lane traffic.  Beginning Monday
                   morning March 31st, 2014 at 8:00am MST, there will be a 12 foot width
                   restriction imposed between mile post 77 and 85. Two lane, two way
                   traffic will be in the I-90 eastbound lanes for westbound bridge
                   construction.
                   
                   Beginning Tuesday morning April 1, 2014. Wide load piloting will begin
                   between milepost 77 and 85 as follows:
                   
                   Westbound loads over 12 feet wide are required to stage in the staging
                   area at milepost 93 (WB Frenchtown Inspection Area). At 6 AM (MST) the
                   staged loads will be piloted to milepost 77.
                   
                   Eastbound Loads over 12 feet wide are required to stage at milepost 72
                   (EB Alberton Parking Area). At 8 AM (MST) the staged loads will be
                   piloted to milepost 85. 
                   
                   Any oversized load missing the designated pilot times will be required
                   to wait until the next opening to be escorted through. Piloting will
                   take place Monday - Thursday only.
                   
           
          I-90  
          Mile Marker 172.6 to 188.6
                   Beck Hill to Deer Lodge and Garrison to Beck Hill.  Bridge work in
                   progress. There is a width restriction of 10 feet.  Expect detour,
                   reduced speed to 35 MPH, single lane traffic.  Westbound wide loads
                   will be detoured at the East Garrison Interchange - Exit 175 milemarker
                   175.5 - and will re-enter at the West Garrison Interchange - Exit 174
                   milemarker 174.4.  Eastbound wide loads will be detoured at the West
                   Garrison Interchange - Exit 174 - and will re-enter at the East
                   Garrison Interchange - Exit 175.  The Beck Hill Interchange - Exit 179
                   milemarker 179.2 - will be single lane traffic controlled by traffic
                   signals.  The South Deer Lodge Interchange - Exit 187 milemarker 187.9
                   - will be closed to westbound traffic - traffic will be directed to use
                   either the Racetrack Interchange - Exit 195 milemarker 195.2 - or the
                   North Deer Lodge Interchange - Exit 184 milemarker 184.9.
                   
           
          I-90  
          Mile Marker 274 to 290
                   Between west Three Forks Interchange and two miles east of Manhattan
                   Interchange.  Bridge work in progress. Expect delays up to 15 minutes,
                   reduced speed to 45 MPH, single lane traffic, single lane closures. 
                   Bridge deck seals in progress.
                   
           
          I-90  
          Mile Marker 298.8 to 300.2
                   East Belgrade Interchange - North.  Bridge work in progress. Expect
                   detour, reduced speed to 35 MPH, single lane closures, road closure. 
                   I-90 eastbound and westbound traffic will be detoured to single lane
                   traffic on the on/off ramps, with 35 mph speed limit on ramps. Starting
                   April 16, 2014 there will be a road closure on Alaska Road between Rock
                   Road and Cameron Bridge Road with Alaska Road traffic detoured to
                   Cameron Bridge Road.
                   
           
          I-90  
          Mile Marker 390.9 to 414.8
                   Beginning 1 mile west of Reed Point extending to 4 miles east of
                   Columbus..  Bridge work in progress. There is a width restriction of 13
                   feet.  Expect detour, reduced speed varying from 25 to 65 MPH, single
                   lane closures.  Contractors on site building crossovers in the median
                   and performing bridge work at several locations throughout the project.
                    There will be single lane closures and variable reduced speed in work
                   zones.  Traffic will be detoured around Springtime Interchange by using
                   the exit and entrance ramps.  Watch for crossing and merging haul
                   trucks.  WIDTH RESTRICTIONS AND SPECIAL CONDITIONS: Beginning April 28,
                   2014 width will be restricted to 13'6" and under for the entire length
                   of the project. Wide loads 13'6" and under will only be allowed to pass
                   through the project from 8:00 a.m. to 10:00 a.m. Monday through
                   Thursday.  Prior to 8:00 a.m. Drivers must call 406-671-5212 to arrange
                   movement through the project.  It is recommeded that wide loads
                   planning to pass through the project stage at the Greycliff Rest Area
                   (Eastbound) and Park CIty (Westbound) from 10:00 a.m. to 8:00 a.m. or
                   consider using an alternate route.  Oversized loads exceeding the 13'6"
                   width must use an alternate route.
                   
           
          I-90  
          Mile Marker 509.6 to 509.6
                   Project is located in Big Horn County at Crow Agency.  Miscellaneous
                   work in progress. 
                   
           
          I-94  
          Mile Marker 46.7 to 67
                   Custer to Hysham.  Fencing work in progress.   No impact to roadway.
                   
           
          I-94  
          Mile Marker 83.7 to 87
                   EB and WB lanes from Colstrip interchange going 3.3 miles west. 
                   Grading work in progress. Expect reduced speed to 35 MPH.  16 foot
                   width restriction to be in effect beginning 04/21/14.
                   
           
          I-94  OLD HIGHWAY 10
          Mile Marker 182 to 182
                   3 miles southwest of Fallon.  Reconstruction work in progress. Expect
                   road closure.  The closure is actually on old highway 10 from mile post
                   26.8 to 27.3 not on the interstate. Road closed to through traffic.
                   Local access from Terry or Fallon only.
                   
           
          MT-1  
          Mile Marker 38.5 to 48.2
                   Philipsburg Maxville.  Paving work in progress. Expect reduced speed to
                   35 MPH, single lane traffic.  Riverside Construction will be paving on
                   MT 1 between mileposts 38.5 and 48.2, Expect reduced speed, single lane
                   traffic, delays and pilot cars.
                   
           
          MT-1  
          Mile Marker 62.5 to 63.9
                   Drummond - South.  Bridge work in progress. Expect detour.  TRAFFIC IS
                   DETOURED TO OLD HWY 10 THROUGH DRUMMOND.
                   
           
          MT-16  
          Mile Marker 0 to 1.1
                   In Culbertson.  Reconstruction work in progress. There is a width
                   restriction of 14 feet.  Expect delays up to 15 minutes, detour, pilot
                   cars, rough roadway surface, intersection work, traffic controlled by
                   signal lights, flaggers.
                   
           
          MT-59  
          Mile Marker 4.4 to 9.1
                   3.2 miles south of Biddle to 1.5 miles north of Biddle.  Seeding work
                   in progress.   Seeding is scheduled to begin April 23, 2014.
                   
           
          MT-59  
          Mile Marker 9.1 to 22
                   1.5 miles north of Biddle to 14.3 miles north of Biddle.  Grading work
                   in progress. There is a width restriction of 14 feet.  Expect delays up
                   to 15 minutes, loose gravel, reduced speed to 35 MPH, gravel surface,
                   single lane closures, traffic controlled by signal lights.  Roadway
                   digouts are scheduled to begin 04/21/14. 14 foot width restriction to
                   be in effect beginning 04/21/14.
                   
           
          MT-66  
          Mile Marker 8 to 10
                   9 miles north of DY Junction at US 191 & MT 66.  Miscellaneous work in
                   progress. Expect delays up to 15 minutes, reduced speed to 35 MPH,
                   flaggers.
                   
           
          MT-78  
          Mile Marker 26.8 to 29.8
                   Stillwater County.  Miscellaneous work in progress. Expect delays up to
                   10 minutes, reduced speed to 35 MPH.  Single lane traffic at times. 
                   Flaggers and possible pilot cars if work zone gets long.
                   
           
          MT-80  
          Mile Marker 43.1 to 48.7
                   Arrow Creek Slide Repair    -  18 miles North of Stanford. 
                   Reconstruction work in progress. There is a width restriction of 12
                   feet.  Expect delays up to 15 minutes, loose gravel, reduced speed to
                   35 MPH, pilot cars, gravel surface, rough roadway surface, single lane
                   traffic, single lane closures, traffic controlled by signal lights,
                   flaggers, motorcycles consider another route.  Contractor will be
                   installing blocks, rip rap and embankment, also excavating waste along
                   roadway. Travelers should watch for equipment entering the roadway. 
                   Expect a 12 foot width restriction during daylight hours and possibly
                   overnight until July 1, 2014.  Contact: PM Kyle Dubbs for current
                   conditions and ability to pass through this construction zone with
                   widths larger than 12 feet.
                   
           
          S-203  
          Mile Marker 9.8 to 11.9
                   Florence East.  Bridge work in progress. Expect reduced speed to 45
                   MPH, flaggers.  Bridge work, culvert installation and reduced speed
                   limits with some delays should be expected throughout the project.Watch
                   for heavy truck traffic and crane activity.
                    The bike paths from highway 93 to the fishing access on the Bitterroot
                   River will be closed until the completion of the project.
                   
           
          S-226  
          Mile Marker 2.5 to 2.7
                   Intersection of S-226 (Eden Road) and Fisher Road.  Reconstruction work
                   in progress. Expect detour, reduced speed to 45 MPH, single lane
                   traffic, intersection work.  Shoulder work on the northbound lane of
                   S-226 and reconstruction of Fisher Road intersection. Fisher Road will
                   be closed to thru traffic.
                   
           
          S-232  
          Mile Marker 34.1 to 43.4
                   34 Miles NW of Havre to Canadian Line.  Crack sealing work in progress.
                   Expect reduced speed to 35 MPH, flaggers.  Work is scheduled to begin
                   Monday, April 14th and will last approximately 3 weeks.
                   
           
          S-236  
          Mile Marker 74.2 to 89.5
                   Big Sandy - SE.  Crack sealing work in progress. Expect reduced speed
                   to 35 MPH, flaggers.  Work is scheduled to begin Monday, April 14th and
                   will last approximately 5 weeks.
                   
           
          S-240  
          Mile Marker 2.8 to 3.1
                   3 Mile Creek - 2 Miles South of Chinook.  Bridge work in progress.
                   Expect detour, loose gravel, reduced speed to 35 MPH.
                   
           
          S-292  WHITEFISH STAGE ROAD
          Mile Marker 7.5 to 8.4
                   1 mile south of MT 40, near Whitefish.  Miscellaneous work in progress. 
                   
           
          S-300  
          Mile Marker 1 to 1.2
                   Fish Creek Bridge - South of Ryegate.  Bridge work in progress. There
                   is a width restriction of 12 feet, a weight restriction of 8 tons. 
                   Expect detour, reduced speed to 35 MPH, single lane traffic, single
                   lane closures.  A temporary bridge is in place, with a width
                   restriction of 12 feet.  No over weight loads allowed on the bridge. 
                   Over width or over weight loads can take the Barber / Ramage Rd. detour.
                   
           
          S-357  
          Mile Marker 0 to 4.8
                   Alder to 5 miles south.  Culvert installation work in progress. Expect
                   reduced speed to 35 MPH.  Fencing also in progress.
                   
           
          S-451  
          Mile Marker 33.3 to 33.3
                   3 miles south of Wyola.  Miscellaneous work in progress. 
                   
           
          S-548  KALISPELL-W RESERVE DR AT US93
          Mile Marker 4 to 4.3
                   Kalispell Bypass - Reserve Loop to US93, North of Kalispell. 
                   Miscellaneous work in progress.   Miscellaneous activities are
                   underway.  Chip Sealing operations are expected to take place later
                   this Spring, 2014.
                   
                   For more information call; Schellinger Construction at 406-892-2188.
                   
           
          US-12  
          Mile Marker 17.1 to 20.1
                   Deep Creek Canyon east of Townsend.  Bridge work in progress. There is
                   a width restriction of 10 feet.  Expect delays up to 15 minutes,
                   reduced speed to 25 MPH, pilot cars, single lane traffic, single lane
                   closures, traffic controlled by signal lights.  Loads over 10' in width
                   will be required to find an alternate route.  Drilled shaft work and
                   stream restoration also in progress which will require single lane
                   traffic.  Two-way traffic will be restored during non-working hours.
                   
           
          US-12  
          Mile Marker 69.9 to 70
                   West of Plevna.  Reconstruction work in progress. Expect reduced speed
                   to 35 MPH, gravel surface, single lane traffic, flaggers.
                   
           
          US-12  
          Mile Marker 71.7 to 77.1
                   Checkerboard Martinsdale East.  Reconstruction work in progress. Expect
                   loose gravel, reduced speed to 35 MPH, pilot cars, gravel surface,
                   rough roadway surface, single lane traffic, grooved surface, traffic
                   controlled by signal lights, motorcycles consider another route.
                   
           
          US-191  
          Mile Marker 33.4 to 37.9
                   Lebo Creek North & South - South of Harlowton, MT.  Reconstruction work
                   in progress. Expect delays up to 15 minutes, reduced speed to 35 MPH,
                   gravel surface, single lane traffic, flaggers, motorcycles consider
                   another route.  The northern third of this project will be pulverized
                   this week.
                   
           
          US-191  
          Mile Marker 41.4 to 66.1
                   Gallatin Canyon Turn Lanes.  Reconstruction work in progress. There is
                   a width restriction of 12 feet.  Expect delays of 15 to 60 minutes,
                   reduced speed to 35 MPH, pilot cars, single lane traffic.  15 minute
                   delays with up to 60 minute delays for rock excavation. Rock work is
                   scheduled to begin April 15, 2014.
                   
           
          US-191  
          Mile Marker 83.4 to 94.4
                   Missouri River North and South.  Reconstruction work in progress. There
                   is a width restriction of 12 feet.  Expect delays up to 15 minutes,
                   reduced speed to 35 MPH, pilot cars, single lane traffic, single lane
                   closures, grooved surface, traffic controlled by signal lights,
                   flaggers, motorcycles consider another route.  From 4.5 miles south to
                   6.5 miles north of the Missouri River and Fred Robinson bridge
                   contractor will be paving and stripping top soil.  There will be a 12
                   foot width restriction from 6am to 9pm daily.
                   
           
          US-191  
          Mile Marker 84 to 85.7
                   Mobridge Slides Armells Creek - 3 miles south of Missouri River (Fred
                   Robinson) Bridge.  Reconstruction work in progress.   Contractor is
                   installing turf mat, fencing, grading and installing rip rap.  All work
                   will be performed off the roadway.  Traffic will be impacted by
                   equipment entering the roadway during day time hours only.
                   
           
          US-2  LIBBY CREEK SOUTH
          Mile Marker 44.9 to 48.6
                   12 miles southeast of Libby.  Grading work in progress. Expect reduced
                   speed to 35 MPH, pilot cars, single lane closures, flaggers.  Grading
                   operations continue.  Rock Work closures will begin soon.  Initial
                   drilling and weather predictions and other preparations are all
                   factored into the scheduling.  Timing details will be provided as soon
                   as preparations and scheduling decisions have been confirmed.
                   
           
          US-2  LA SALLE ROAD
          Mile Marker 129.8 to 133.1
                   NE of Kalispell from Pioneer Rd to Conn Road.  Sign installation work
                   in progress. Expect delays up to 15 minutes, single lane traffic. 
                   Operations include sign installations on shoulders and at
                   intersections.  Delays will only affect crossroads during striping.
                   
           
          US-2  
          Mile Marker 139.9 to 142.3
                   3 miles East of Columbia Falls.  Sign installation work in progress.
                   Expect delays up to 15 minutes, reduced speed to 35 MPH, flaggers. 
                   Operations will include: shoulder work for sign installation, rumble
                   strip operations on center line.
                   
           
          US-2  
          Mile Marker 384 to 386.6
                   Havre-East.  Reconstruction work in progress. Expect reduced speed to
                   35 MPH, pilot cars, rough roadway surface, single lane traffic, traffic
                   controlled by signal lights.
                   
           
          US-2  
          Mile Marker 639.6 to 644.2
                   West of Culbertson.  Miscellaneous work in progress. 
                   
           
          US-212  
          Mile Marker 62.7 to 69.2
                   Ashland to 7 miles east.  Miscellaneous work in progress. Expect
                   reduced speed to 35 MPH.
                   
           
          US-310  
          Mile Marker 51.9 to 53.1
                   South of Laurel-Railroad Overpass.  Reconstruction work in progress.  
                   Bridge contractor will continue to build new structures.  Embankment is
                   being placed for new roadway alignment.  Watch for haul trucks crossing
                   the highway.
                   
           
          US-87  
          Mile Marker 30 to 31
                   Carter North.  Grading work in progress. Expect reduced speed to 35
                   MPH, pilot cars.
                   
           
          US-93  WHITEFISH - WEST
          Mile Marker 127.8 to 128.5
                   Between Baker and Karrow Avenues.  Sidewalk work in progress. Expect
                   reduced speed to 35 MPH, single lane closures, flaggers.
                   
           
            BILLINGS - MONTANA AVE
          Mile Marker .2 to 4.3
                   Project is located in Billings on Montana Avenue and Laurel Road. 
                   Paving work in progress. Expect delays of 5 to 5 minutes, single lane
                   closures.  Cold milling and paving has begun on Laurel Road.  Curb,
                   gutter and sidewalk work on Montana Avenue continues.  Excavating
                   digout areas on Montana Avenue from North 19th street to North 18th
                   street.
                   
           
            KALISPELL BYPASS
          Mile Marker .9 to .9
                   THREE MILE DRIVE (mile marker 0.5-0.9), West of Kalispell, North of
                   US-2..  Bridge work in progress.   Overpass construction at three mile
                   drive is underway.Operations are taking place off of the roadway and is
                   not affecting traffic at this time.
                   
           
            VAUGHN FRONTAGE ROAD
          Mile Marker 4.3 to 7.9
                   Vaughn Frontage Road - Guardrail / Slope Flattening.  Grading work in
                   progress.   Beginning Thursday, May 1st, the contractor will be
                   performing topsoil removal along the roadway and ditch grading. Expect
                   reduced speeds and single-lane traffic at times.
                   
           
           
                              COMPLETED OR INACTIVE CONSTRUCTION PROJECTS
           
          I-15  
          Mile Marker 54 to 64
                   Work on this project is temporarily suspended. When work resumes please
                   expect the following: Barretts - Dillon.  Bridge work in progress.  
                   Winter shutdown.
                   
           
          I-15  
          Mile Marker 192 to 192
                   Work on this project is temporarily suspended. When work resumes please
                   expect the following: Helena - Intersection of Broadway and Colonial
                   Drive.  Miscellaneous work in progress.   Winter shutdown.
                   
           
          I-15  
          Mile Marker 231.9 to 231.9
                   Work on this project is temporarily suspended. When work resumes please
                   expect the following: North of Wolf Creek.  Miscellaneous work in
                   progress.   Winter shutdown.
                   
           
          I-15  
          Mile Marker 328.1 to 343.2
                   Work on this project is temporarily suspended. When work resumes please
                   expect the following: Between Conrad and Shelby.  Miscellaneous work in
                   progress. Expect reduced speed to 45 MPH, single lane traffic.
                   
           
          I-15  
          Mile Marker 351 to 351
                   Work on this project is temporarily suspended. When work resumes please
                   expect the following: North of Sunburst.  Miscellaneous work in
                   progress.   Winter shutdown.
                   
           
          I-90  
          Mile Marker 4.6 to 4.8
                   Work on this project is temporarily suspended. When work resumes please
                   expect the following: Dena Mora Rest Area.  Miscellaneous work in
                   progress. 
                   
           
          I-90  
          Mile Marker 5 to 19
                   Work on this project is temporarily suspended. When work resumes please
                   expect the following: Taft Interchange to the DeBorgia Interchange. 
                   Miscellaneous work in progress. 
                   
           
          I-90  
          Mile Marker 297.5 to 298.8
                   Work on this project is temporarily suspended. When work resumes please
                   expect the following: I-90 Belgrade Exit and Amsterdam Road. 
                   Miscellaneous work in progress.   Winter shutdown.
                   
           
          I-90  
          Mile Marker 304 to 313
                   Work on this project is temporarily suspended. When work resumes please
                   expect the following: West Bozeman Interchange.  Bridge work in
                   progress.   Waiting for striping.
                   
           
          I-90  
          Mile Marker 316 to 316.5
                   Work on this project is temporarily suspended. When work resumes please
                   expect the following: East of Bozeman (approximately 6 miles) -West of
                   Chestnut-Slide Repairs.  Shoulder work in progress.   Winter shutdown.
                   
           
          I-90  
          Mile Marker 324 to 324
                   Work on this project is temporarily suspended. When work resumes please
                   expect the following: Bozeman - Northwest Corner of the Hopper
                   Interchange.  Seeding work in progress.   Winter shutdown.
                   
           
          I-90  
          Mile Marker 379 to 381
                   Work on this project is temporarily suspended. When work resumes please
                   expect the following: 10 miles east of Big Timber.    Both east and
                   west bound rest areas are closed for the duration of this project. 
                   Work is being done off the roadway.  There are no traffic restrictions
                   at this time.
                   
           
          I-90  
          Mile Marker 531.7 to 543.5
                   This project has been completed.  One mile South of Lodge Grass to 11.7
                   miles south.  Bridge work in progress.   Project is complete.
                   
           
          I-90  
          Mile Marker 543.5 to 554.4
                   Work on this project is temporarily suspended. When work resumes please
                   expect the following: Approximately 11 miles south of Wyola continuing
                   to north of Wyola. Project is located entirely within the Crow Indian
                   Reservation.  Miscellaneous work in progress.   Winter shut down.
                   
           
          I-94  
          Mile Marker 130 to 131.6
                   Work on this project is temporarily suspended. When work resumes please
                   expect the following: 8 miles W of Miles City.  Miscellaneous work in
                   progress.   Winter shutdown.
                   
           
          I-94  
          Mile Marker 223.8 to 231.4
                   Work on this project is temporarily suspended. When work resumes please
                   expect the following: Hodges Interchange - west.  Miscellaneous work in
                   progress.   Winter shutdown.
                   
           
          MT-2  
          Mile Marker 88.3 to 89.1
                   Work on this project is temporarily suspended. When work resumes please
                   expect the following: Business Loop - Butte - Utah Avenue, MT Front St
                   to Park St.  Miscellaneous work in progress. Expect single lane traffic.
                   
           
          MT-200  
          Mile Marker 29.5 to 46.2
                   Work on this project is temporarily suspended. When work resumes please
                   expect the following: Trout Creek South East.  Striping work in
                   progress. 
                   
           
          MT-200  
          Mile Marker 279.7 to 279.7
                   Work on this project is temporarily suspended. When work resumes please
                   expect the following: MCS Scale Sites.  Miscellaneous work in progress.
                     The Circle scale site is closed for rehab and restoration.
                   
           
          MT-37  LIBBY DAM - SOUTH
          Mile Marker 9.6 to 17.2
                   Work on this project is temporarily suspended. When work resumes please
                   expect the following: North of Junction US2.  Miscellaneous work in
                   progress. 
                   
           
          MT-59  
          Mile Marker 0 to 4.5
                   Work on this project is temporarily suspended. When work resumes please
                   expect the following: Wyoming line to 4.55 miles North.  Miscellaneous
                   work in progress.   Winter shutdown.
                   
           
          MT-72  
          Mile Marker 10.5 to 12.5
                   This project has been completed.  Belfry to approximately 3 miles
                   north.  Miscellaneous work in progress. 
                   
           
          MT-72  
          Mile Marker 16.1 to 20.8
                   This project has been completed.  From 16 miles north of Wyoming State
                   Line to Jct with US 310.  Miscellaneous work in progress. 
                   
           
          MT-80  
          Mile Marker 59.9 to 66.1
                   Work on this project is temporarily suspended. When work resumes please
                   expect the following: 6 miles North of Stanford.  Paving work in
                   progress.   A chip seal scheduled for June/July 2014; with no
                   restrictions to travels until then.
                   
           
          MT-81  
          Mile Marker 25.5 to 26.7
                   Work on this project is temporarily suspended. When work resumes please
                   expect the following: Eleven miles east of Denton - One mile east of
                   Judith River Bridge.  Reconstruction work in progress.   Project is
                   inactive at this time.  A chip seal and epoxy striping will be
                   completed in July 2014.
                   
           
          MT-81  
          Mile Marker 29.5 to 32.8
                   Work on this project is temporarily suspended. When work resumes please
                   expect the following: Approximately 16 miles east of Denton to the new
                   Warm Springs Creek Bridge.  Shoulder work in progress.   Winter Shut
                   Down.
                   
           
          MT-85  US-191
          Mile Marker 0 to 3.1
                   Work on this project is temporarily suspended. When work resumes please
                   expect the following: US-191 south of intersection with MT-85. 
                   Shoulder work in progress.   Winter shutdown.
                   
           
          S-254  
          Mile Marker 17.4 to 23.4
                   Work on this project is temporarily suspended. When work resumes please
                   expect the following: 6.1 Miles South of Bloomfield to 2 miles North of
                   Bloomfield.  Miscellaneous work in progress.   Winter shutdown.
                   
           
          S-269  
          Mile Marker 3.5 to 3.8
                   Work on this project is temporarily suspended. When work resumes please
                   expect the following: South of Corvallis.  Sign installation work in
                   progress.   Sign installation and seeding crews will be at work, mostly
                   limited to shoulder work. A limited amount of traffic control will be
                   on the project, there may be some delays.
                   Winter Shutdown.
                   
           
          S-294  
          Mile Marker 11.1 to 11.2
                   Work on this project is temporarily suspended. When work resumes please
                   expect the following: Bozeman Fork Creek 4 miles southwest of Lennep. 
                   Miscellaneous work in progress.   Winter shutdown.
                   
           
          S-314  
          Mile Marker 6.8 to 17.5
                   Work on this project is temporarily suspended. When work resumes please
                   expect the following: Junction with S-566 continuing south east 10.8
                   miles.  Miscellaneous work in progress.   Winter shut down.
                   
           
          S-323  
          Mile Marker 0 to 66
                   Work on this project is temporarily suspended. When work resumes please
                   expect the following: Ekalaka to Alzada.  Miscellaneous work in
                   progress.   Winter shutdown.
                   
           
          S-489  
          Mile Marker 9.2 to 9.3
                   Work on this project is temporarily suspended. When work resumes please
                   expect the following: Sunday Creek.  Miscellaneous work in progress.  
                   Winter shutdown.
                   
           
          S-493  
          Mile Marker 0 to .5
                   Work on this project is temporarily suspended. When work resumes please
                   expect the following: Culvert northwest of Baker.  Miscellaneous work
                   in progress.   Winter shutdown.
                   
           
          S-548  WEST RESERVE
          Mile Marker 0 to 3
                   Work on this project is temporarily suspended. When work resumes please
                   expect the following: NW of Kalispell, from Jct at Farm to Market to
                   the Roundabout.  Sign installation work in progress. Expect reduced
                   speed to 35 MPH, single lane traffic, flaggers.
                   
           
          S-567  PIPE CREEK ROAD (LIBBY)
          Mile Marker 6.5 to 12
                   Work on this project is temporarily suspended. When work resumes please
                   expect the following: Blue Mountain Road to Noisy Creek Road. 
                   Reconstruction work in progress. 
                   
           
          S-567  PIPE CREEK ROAD (LIBBY)
          Mile Marker 12 to 20.1
                   Work on this project is temporarily suspended. When work resumes please
                   expect the following: Noisy Creek Road to Turner Mountain Road. 
                   Miscellaneous work in progress. 
                   
           
          US-12  
          Mile Marker 42.5 to 42.7
                   Work on this project is temporarily suspended. When work resumes please
                   expect the following: Helena - Intersection of Benton & Lyndale. 
                   Miscellaneous work in progress.   Winter shutdown.
                   
           
          US-12  
          Mile Marker 43.3 to 44.2
                   Work on this project is temporarily suspended. When work resumes please
                   expect the following: Helena - Broadway from Park to Montana Ave. 
                   Miscellaneous work in progress.   Winter shutdown.
                   
           
          US-12  
          Mile Marker 44.4 to 45.4
                   Work on this project is temporarily suspended. When work resumes please
                   expect the following: Helena - 11th Ave.  Miscellaneous work in
                   progress.   Winter shutdown.
                   
           
          US-12  
          Mile Marker 45.9 to 46.1
                   Work on this project is temporarily suspended. When work resumes please
                   expect the following: Helena - Intersection of US-12 and Carter Drive. 
                   Miscellaneous work in progress.   Winter shutdown.
                   
           
          US-12  CONCURRENT WITH MT 3
          Mile Marker 100.5 to 101.4
                   Work on this project is temporarily suspended. When work resumes please
                   expect the following: Harlowton MCS Scale site, near intersection of US
                   12/MT3 and US 191.  Miscellaneous work in progress.   Project is
                   inactive until the seal and cover can be completed in the Spring of
                   2014.
                   
           
          US-12  
          Mile Marker 108 to 116.5
                   Work on this project is temporarily suspended. When work resumes please
                   expect the following: Shawmut West- Seven miles east of Junction of US
                   191 / US 12 in Harlowton.  Miscellaneous work in progress.   Project is
                   waiting on final ditch repair to be complete.  No restrictions.
                   
           
          US-191  BIG TIMBER BUSINESS LOOP
          Mile Marker 2.6 to 2.6
                   This project has been completed.  Big Timber Business Loop. 
                   Miscellaneous work in progress.   Project complete.
                   
           
          US-2  16 MILES SE OF LIBBY
          Mile Marker 48.8 to 53.6
                   Work on this project is temporarily suspended. When work resumes please
                   expect the following: Swamp Creek - East.  Shoulder work in progress.  
                   Work is expected to resume mid-Summer of 2014.
                   
           
          US-2  
          Mile Marker 137.1 to 137.5
                   Work on this project is temporarily suspended. When work resumes please
                   expect the following: 1/2 mile East of Columbia Falls.  Sign
                   installation work in progress. 
                   
           
          US-2  
          Mile Marker 168.1 to 168.6
                   Work on this project is temporarily suspended. When work resumes please
                   expect the following: 15 miles East of West Glacier.  Sign installation
                   work in progress. Expect delays up to 15 minutes, reduced speed to 35
                   MPH, single lane traffic, flaggers.
                   
           
          US-2  
          Mile Marker 603 to 611.5
                   Work on this project is temporarily suspended. When work resumes please
                   expect the following: Poplar - west.  Miscellaneous work in progress.  
                   Winter shutdown.
                   
           
          US-212  
          Mile Marker 97 to 105
                   Work on this project is temporarily suspended. When work resumes please
                   expect the following: East and west of Boyes.  Miscellaneous work in
                   progress.   Winter shutdown.
                   
           
          US-287  
          Mile Marker 60.6 to 62
                   Work on this project is temporarily suspended. When work resumes please
                   expect the following: Intersection of US-287 with Broadwater County
                   Roads Filson and Quarter Circle.  Miscellaneous work in progress.
                   Expect delays up to 15 minutes, reduced speed to 55 MPH, traffic
                   controlled by signal lights.  Project is shut down until June 2, 2014.
                   
           
          US-87  
          Mile Marker 83.2 to 86
                   Work on this project is temporarily suspended. When work resumes please
                   expect the following: Lewistown East -.  Reconstruction work in
                   progress.   All restrictions have been lifted.  Chip seal and striping
                   scheduled June 2014.
                   
           
          US-89  
          Mile Marker 8 to 10
                   Work on this project is temporarily suspended. When work resumes please
                   expect the following: 8 to 10 miles north of Gardiner.  Miscellaneous
                   work in progress. 
                   
           
          US-89  
          Mile Marker 64.6 to 70.5
                   Work on this project is temporarily suspended. When work resumes please
                   expect the following: Southeast of Dupuyer.  Reconstruction work in
                   progress.   Winter shutdown.
                   
           
          US-89  10TH AVE S GREAT FALLS
          Mile Marker 93.9 to 95
                   Work on this project is temporarily suspended. When work resumes please
                   expect the following: 10th Ave S, Warden Bridge to 18th Street South;
                   Central Ave W, 3rd St to 9th St; 10th St N, River Dr to Smelter. 
                   Miscellaneous work in progress.   Winter shutdown.
                   
           
            EAST OF CLARK FORK
          Mile Marker 3 to 3
                   Work on this project is temporarily suspended. When work resumes please
                   expect the following: Phosphate Frontage Road.  Seeding work in
                   progress. 
                   
           
            SOUTH FRONTAGE ROAD
          Mile Marker 7.6 to 7.6
                   Work on this project is temporarily suspended. When work resumes please
                   expect the following: 8 miles south of Deer Lodge at South Frontage
                   Road and Racetrack Road.  Reconstruction work in progress.   Winter
                   shutdown.
                   
           
            I-94 FRONTAGE ROAD
          Mile Marker 126 to 128
                   Work on this project is temporarily suspended. When work resumes please
                   expect the following: I-94 Frontage Road near Miles City. 
                   Miscellaneous work in progress.   Winter shutdown.
                   
  