23 MAY 2012  MONTANA DEPARTMENT OF TRANSPORTATION 
Report Name: RRSR0031    ROAD CONSTRUCTION REPORT
For information please contact:
Donna Belderrain (406) 444-6372
     This is a report of road construction on Montana's interstates and major  highways.  This report includes information available at the time of preparation.
     This report is available by telephone at 511 or 1-800-226-7623.  For the  hearing impaired, call the TTY number 1-800-335-7592.
     TRAFFIC FINES DOUBLE in highway work zones.  The law also set fines and jail sentences for reckless endangerment of highway workers.
     MINOR DELAYS (up to ten minutes) can be expected through these projects with anything over ten minutes being noted in the description.  Watch for equipment,  flaggers, and workers along the road.  Expect reduced speed limits.
I-15  Work on this project is temporarily suspended.  When work  resumes please expect the following:  Monida Interchange  proceeding north.  Miscellaneous work in progress.     Inactive until next spring.
I-15  Work on this project is temporarily suspended.  When work  resumes please expect the following:  Divide- North and  South.  Rumble strip work in progress.  There is a width  restriction of 16 feet.  Expect reduced speed to 35 mph,  single lane traffic.  Inactive until chip seal.
I-15  Feely Interchange- North & South.  Paving work in progress.   There is a width restriction of 16 feet.  Expect reduced  speed to 35 mph, single lane traffic.  Guardrail, Milling,  striping and sweeping.
I-15  Concurrent  with I-90
Work on this project is temporarily suspended.  When work  resumes please expect the following:  Located within the  Montana Pole and Treating Plant Superfund Site-Butte.   Guardrail work in progress.  Expect reduced speed to 35 mph,  single lane closures.  Inactive until further notice.
I-15  Helena - Custer Interchange and Helena Valley Canal Bridge.   Bridge work in progress.  There is a width restriction of 14  feet.    Custer Avenue Bridge is open. Lane crossovers and  two-way traffic continue to be active on I-15. Travelers  should expect a width restriction of 14 feet and reduced  speeds. Oversized loads can be accommodated on I-15 by  calling Steve (406-207-0855) 6:00 AM to 6:00 PM and Jerry  (406-207-0858) overnight to coordinate movement through the  project. The public can call the Schellinger office at 406- 442-1517 or Nathan Malmin, Project Manager at 406-471-2335  with any questions or concerns or visit this website  http://www.mdt.mt.gov/custer/.
.
http://www.mdt.mt.gov/custer/
I-15  I-15 Augusta Interchange to Craig.  Pulverizing work in  progress.  There is a width restriction of 14 feet.    Two- lane traffic will be in the northbound lane throughout this  phase of the project. Wide loads over 14 feet will be moved  through the project between 7 AM and 9AM Monday through  Thursday. No other passage through the project for wide loads over 14 feet will be allowed. Contact Keith Johnston at 406- 490-9210 for more information or to schedule passage.
I-15  Immediately Adjacent to and Northeast of the City of Conrad.  Reconstruction work in progress.  Expect reduced speed to 35  mph.  The contractor is engaged in gravel and building  operations and boring under the Interstate and railroad.  Motorists should be aware of truck and equipment activity.
I-315  Great Falls - 10th Ave S / Fox Farm RD.  Signal installation  work in progress.  Expect single lane traffic, single lane  closures, intersection work.  All traffic should avoid the  intersection if possible to reduce congestion. Expect delays  during peak hours. Tractor-trailer units planning to make a  turn at the intersection should plan to us an alternate  route.
I-90  Montana - Idaho line to the Taft Interchange.  Guardrail work in progress.  Expect reduced speed to 35 mph, single lane  closures.
I-90  Taft Interchange to Ninemile Interchange.  Bridge work in  progress.  There is a width restriction of 12 feet.  Expect  delays up to 30 minutes, reduced speed to 35 mph, single lane closures.  EASTBOUND LOADS over 12 feet wide must stage at  milepost 4.6. At 5 a.m. they will be piloted to milepost 13.  These loads will be staged again at milepost 52. At 6:15 a.m. they will be piloted to milepost 63. Eastbound loads missing  the designated piloting times will be required to wait until  the next opening.  Beginning May 30, 2012, eastbound  oversized loads must continue on and cross the bridge at  milepost 81prior to 7:00 a.m.  Loads not meeting this  deadline will be required to wait for the next opening.
 
WESTBOUND LOADS over 12 feet wide must stage at milpost 63.  At 5 a.m.they will be piloted to milepost 52. These loads  will be staged again at the Haugan Weigh Scale at milepost  15. At 6:15 a.m. they will be piloted to milepost 5.7.  Westbound loads missing the designated piloting times will be required to wait for the next opening.
 
The general traveling public can expect delays during the  piloting hours.
I-90  Seven miles west of St. Regis.  Guardrail work in progress.   Expect reduced speed to 35 mph, single lane closures.  Refer  to Taft Interchange to Ninemile Interchange for restrictions.
I-90  Ten miles west of St. Regis.  Bridge work in progress.   Expect reduced speed to 35 mph, single lane closures.  Refer  to the Taft Interchange to Ninemile Interchange project for  restictions.
I-90  Work on this project is temporarily suspended.  When work  resumes please expect the following:  Superior Area to Tarkio area.  Miscellaneous work in progress.    Refer to the Taft  Interchange to Ninemile Interchange project for restrictions.
I-90  East of Superior to Ninemile.  Bridge work in progress.   There is a width restriction of 12 feet.  Expect delays up to 30 minutes, reduced speed to 35 mph, pilot cars, single lane  closures.  Refer to the Taft Interchange to Ninemile  Interchange project for restrictions.
I-90  East of Tarkio.  Miscellaneous work in progress.    Refer to  the Taft Interchange to Ninemile Interchange project for  restrictions.  
The old bridge on Old US-10 west of the Fish Creek  Interchange, is scheduled to be permanently closed on  Thursday, May 24, 2012.  Access to the Crystal Springs area  can now be done at the Crystal Springs Interchange at  milepost 66.
I-90  Work on this project is temporarily suspended.  When work  resumes please expect the following:  20 miles west of  Missoula (Alberton area).  Surveying work in progress.  There is a width restriction of 12 feet.  Expect reduced speed to  35 mph, single lane traffic.
 East of Clark Fork
Work on this project is temporarily suspended.  When work  resumes please expect the following:  Phosphate Frontage  Road.  Miscellaneous work in progress.    Wash out-Clark  Fork.
I-90  East and West of Deer Lodge on I-90 MM 184.9 and 187.   Guardrail work in progress.  There is a width restriction of  14 feet.  Expect detour, reduced speed to 35 mph, single lane closures, traffic controlled by signal lights, flaggers.   Bridge and Median work starting date April 18, 2012. Expect  median crossovers, two way traffic and a 14' wide restriction to accomodate loads over 14' wide call Mountain West Traffic  Control (406) 490-8390 24 hours in advance. Wide load detour  is set up at the North Deer Lodge Interchange mp 184 and the  South Deer Lodge Interchange at MP 187. Detour/median  crossover two way traffic in the east bound lane throughout  the project.
I-90  Work on this project is temporarily suspended.  When work  resumes please expect the following:  Deer Lodge to six miles south.  Miscellaneous work in progress.    No work until Chip Seal in July 2012.
I-90  Work on this project is temporarily suspended.  When work  resumes please expect the following:  Continental Drive  Interchange.  Striping work in progress.  
I-90  Work on this project is temporarily suspended.  When work  resumes please expect the following:  Homestake Pass Rest  Areas east of Butte.  Seeding work in progress.    No work on project at this time.
I-90  Work on this project is temporarily suspended.  When work  resumes please expect the following:  Cardwell to Cottonwood  Hill.  Striping work in progress.    Waiting for final  striping.
I-90  Approximately 10 miles west of Three Forks to the Three Forks Interchange.  Crack sealing work in progress.  There is a  width restriction of 12 feet.  Expect delays of 15 to 15  minutes, reduced speed to 35 mph, single lane traffic, single lane closures, flaggers.  This project is scheduled to start  on Monday, May 21, 2012 and will be in the Westbound lane.  Work schedule is from 7:00 am to 7:00 pm Monday through  Friday. Width restriction is during work hours only. The  estimated completion date is June 15th weather depending.  Oversized loads will have to find an alternate route between  the hours of 7:00 am to 7:00 pm Monday through Friday.
I-90  Work on this project is temporarily suspended.  When work  resumes please expect the following:  Approximately 10 miles  west of Three Forks to the Three Forks Interchange.  Crack  sealing work in progress.  There is a width restriction of 12 feet.  Expect delays of 15 to 15 minutes, reduced speed to 35 mph, single lane traffic, single lane closures, flaggers.   This project is scheduled to start on Monday, May 21, 2012  and will be in the Eastbound Lane. Work schedule is from 7:00 am to 7:00 pm Monday through Friday. Width restriction is  during work hours only. The estimated completion date is June 15th weather depending. Oversized loads will have to find an  alternate route between the hours of 7:00 am to 7:00 pm  Monday through Friday.
I-90  Work on this project is temporarily suspended.  When work  resumes please expect the following:  East Three Forks  Interchange with the junction of MT-2.  Striping work in  progress.  
I-90  Bozeman E & W.  Bridge work in progress.    Paving is  complete on I-90.  Preliminary bridge work has started on  19th ave and will continue next week.  There may be some  delays on the on and off ramps-watch for and obey  construction signs.
I-90  Work on this project is temporarily suspended.  When work  resumes please expect the following:  Bozeman City limits in  Gallatin County.  Chip sealing work in progress.    No work  until chip seal next summer.
I-90  East of Livingston.  Miscellaneous work in progress.  Expect  reduced speed to 35 mph, single lane closures.  Construction  of Median crossovers.
I-94  Work on this project is temporarily suspended.  When work  resumes please expect the following:  Ballentine East & West.  Miscellaneous work in progress.    Chip Seal is scheduled in June of 2012.
MT-1  Georgetown Lake to Philipsburg.  Sign installation work in  progress.  Expect reduced speed to 35 mph, pilot cars, single lane traffic.
MT-16  18 to 25 miles NE of Glendive.  Reconstruction work in  progress.  Expect delays up to 15 minutes, detour, loose  gravel, reduced speed to 35 mph, pilot cars, gravel surface,  rough roadway surface, single lane traffic, flaggers,  motorcycles consider another route.  0.5 miles of gravel  surface.
MT-16  Work on this project is temporarily suspended.  When work  resumes please expect the following:  Town of Sidney,  milepost 50 to 52.  Miscellaneous work in progress.  Expect  intersection work.  Work is being done at the intersection of 4th St S and 2nd St N.
MT-16  3.5 to 5 miles North of Culbertson.  Miscellaneous work in  progress.  Expect delays up to 15 minutes, reduced speed to  35 mph, single lane traffic, flaggers.
MT-2  Work on this project is temporarily suspended.  When work  resumes please expect the following:  Butte - Grand Avenue to Harrison Avenue.  Reconstruction work in progress.    No work on project until phase two of the work next spring.
MT-2  Butte - Harrison Avenue from Amherst to Front Street.   Reconstruction work in progress.  Expect detour, single lane  traffic.  West bound I-90 / I-15 on ramp turn lane will be  closed, traffic will use middle traffic lane to access the on ramp.
MT-2  Work on this project is temporarily suspended.  When work  resumes please expect the following:  Ten miles southeast of  Butte on Harding Way.  Culvert installation work in progress.  Expect delays of 15 to 20 minutes, reduced speed to 35 mph.  No work until next Spring.
MT-200  Work on this project is temporarily suspended.  When work  resumes please expect the following:  Two miles east of  Bonner.  Miscellaneous work in progress.  
MT-200  Work on this project is temporarily suspended.  When work  resumes please expect the following:  Simms to the JCT with  S-434.  Miscellaneous work in progress.    No work scheduled. Waiting for Seal Coat Warranty date of 12/7/11.
MT-200  Twelve miles east of Winnett, MT.  Reconstruction work in  progress.  Expect delays up to 15 minutes, reduced speed to  35 mph, single lane traffic, flaggers.  There is a reduced  speed of 35 mph during work hours, during NON-work hours the  speed limit will be 55 mph.
MT-200  This project has been completed.  17 Miles East of Jordan to  24 Miles East of Jordan.  Chip sealing work in progress.   Expect loose gravel, reduced speed to 35 mph, gravel surface.  Chip seal is completed, broomed, and striped but still have  loose chips so 35 mph speed limit will be in affect.
MT-28  Work on this project is temporarily suspended.  When work  resumes please expect the following:  Between Elmo and  Niarada.  Overlay work in progress.  Expect fresh oil,  reduced speed to 35 mph, grooved surface, flaggers.  Milling  operations are scheduled to begin Tuesday, May 29, 2012.   Paving is tentatively scheduled to begin Wednesday, May 30,  2012, depending on the weather.  Work is expected to continue through the middle of July, 2012.
MT-3  Work on this project is temporarily suspended.  When work  resumes please expect the following:  Town of Judith Gap.   Reconstruction work in progress.  
MT-3  Concurrent  with US-87/MT- 200
East of Windham.  Reconstruction work in progress.  There is  a height restriction of 15 feet, a width restriction of 12  feet.  Expect delays up to 15 minutes, reduced speed to 35  mph, pilot cars, single lane traffic, single lane closures,  intersection work, traffic controlled by signal lights,  flaggers, motorcycles consider another route.  From 1 mile to 11.5 miles west of Hobson. Work includes surveying, bridge  work, and miscellaneous activities.  Beginning June 4, 2012  there will be a detour from Hobson (Sec-239 to Utica to (Sec- 541) to Windham.  There is a twelve foot width restriction  through the town on Hobson on this detour.  Wider loads will  need to have an alternate route.
MT-38  Skalkaho Road.  Rock work in progress.  Expect road closure.  Beginning May 26, 2012, the road will be closed between  Forest Service Road 711 and Skalkaho Falls.  The road will  open to traffic for fifteen minutes on the even hours.  The  contractor will not close the road on the weekends unless  they are working.  Information signs will be posted on the  road.
MT-39  Work on this project is temporarily suspended.  When work  resumes please expect the following:  Beginning 11 miles  north of Colstrip proceeding 10.2 miles north.  Bridge work  in progress.  Expect reduced speed to 35 mph, single lane  closures.
MT-39  15.5 miles north of Colstrip.  Miscellaneous work in  progress.  Expect reduced speed to 35 mph.
MT-40  Work on this project is temporarily suspended.  When work  resumes please expect the following:  2 miles West of Jct  US2, between Conn Road and Trumble Creek Rd.  Milling work in progress.  Expect detour, fresh oil, loose gravel, reduced  speed to 35 mph, single lane closures, flaggers.  Work is  scheduled to resume on Tuesday, May 29, 2012.  Operations  will include: milling, grading, patching, and paving.  The  eastbound lane will be detoured to the center turn lane.   Estimated completion date is July 9, 2012.
MT-41  Twin Bridges at MM 27 to 13 miles South of Twin Bridges.   Guardrail work in progress.  There is a width restriction of  10 feet.  Expect detour, reduced speed to 35 mph, single lane closures, traffic controlled by signal lights, flaggers.   Bridge and median work in progress. Wide loads over 10 feet  must use I-15 detour. 
Bridge location- Hwy 41, 13 miles south of Twin Bridges.  Bridge location- Hwy 41 at Twin Bridges at MM 27 starting  April 30, 2012.
MT-5  Work on this project is temporarily suspended.  When work  resumes please expect the following:  Redstone east & west.   Miscellaneous work in progress.  
MT-5  From 11.8  to 18 miles west of Plentywood.  Reconstruction  work in progress.  Expect reduced speed varying from 35 to 45 mph, gravel surface, rough roadway surface.
MT-68  Work on this project is temporarily suspended.  When work  resumes please expect the following:  Town of Cascade.   Miscellaneous work in progress.    Work is suspended for  winter shutdown.
MT-72  Work on this project is temporarily suspended.  When work  resumes please expect the following:  2 to 4 miles North of  Belfry.  Seeding work in progress.    INACTIVE UNTIL CHIP  SEAL.
MT-72  From 16 miles north of Wyoming State Line to Jct with US 310.  Reconstruction work in progress.  There is a width  restriction of 14 feet.  Expect loose gravel, reduced speed  to 25 mph, gravel surface, rough roadway surface.  Working on irrigation pipe and mainline.
MT-78  Work on this project is temporarily suspended.  When work  resumes please expect the following:  North of Roscoe.   Striping work in progress.  Expect reduced speed to 35 mph.   Watch for workers and equipment.
MT-78  Work on this project is temporarily suspended.  When work  resumes please expect the following:  Three miles south to  three miles north of Absarokee.  Miscellaneous work in  progress.  
MT-80  North of Geraldine to Arrow Creek.  Striping work in  progress.  Expect reduced speed to 35 mph.  This project  extends south into the Lewistown District by 7.4 miles to  milepost 43.0.
MT-81  Work on this project is temporarily suspended.  When work  resumes please expect the following:  Denton Sidewalks -  Denton, MT.  Sidewalk work in progress.    No restrictions or delays, while waiting for final walk through of project.
MT-81  Sage Creek - Approximately fourteen miles east of Denton near Judith River bridge.  Miscellaneous work in progress.    Sage Creek flood damaged culvert repairs are in progress with  signage but no affect to traveling public.
MT-81  Approximately 16 miles east of Denton to the new Warm Springs Creek Bridge.  Shoulder work in progress.  Expect reduced  speed to 35 mph, single lane closures.  Maintenance crews  will be completing this slope flattening project as time and  weather allows.  Travelers should expect short delays,  flaggers, and reduced speed when crews are present.
MT-81  Work on this project is temporarily suspended.  When work  resumes please expect the following:  Twenty miles east of  Denton - Seven Miles west of Brooks.  Reconstruction work in  progress.  
MT-83  Seeley Lake South MP 5 to MP 12.  Miscellaneous work in  progress.  There is a width restriction of 12 feet.  Expect  reduced speed to 35 mph, pilot cars, single lane traffic,  traffic controlled by signal lights.  Drill geotechnical  borings. Work is scheduled to begin on Monday, April 30,  2012. Drilling will begin at MP 12 in the southbound lane and continue working south. This project is expected to last 4  weeks, weather depending. Traffic control and pilot car will  be provided by Mountain West Holding Co. All loads over 12  feet wide will have to choose an alternate route. Work  schedule will be Monday thru Thursday from 7:00 am to 5:30  pm. Width restriction is in effect during work hours only.  Oversized loads will be able to travel after 5:30 pm and on  Fridays.
MT-83  Work on this project is temporarily suspended.  When work  resumes please expect the following:  Seeley Lake to north of Lake Inez.  Miscellaneous work in progress.  
MT-84  This project has been completed.  Between Norris and Four  Corners.  Miscellaneous work in progress.  There is a width  restriction of 10 feet.  Expect delays up to 5 minutes,  single lane closures, traffic controlled by signal lights.   Installation of traffic sensors.  OVERSIZED LOADS may want to choose an alternate route but can be accommodated but delay  could be up to 2 hours. Work scheduled to begin on May 21st  at 10:00 am to 6:00 pm. Work will resume on 5/22 and 5/23 at  7:00 am and last 6 to 10 hours.
MT-85/ US-191 Starts on US-191 500 ft south of intersection with MT-85 and  continues north on MT-85.  Intersection work in progress.   Expect loose gravel, reduced speed to 35 mph, single lane  closures, intersection work.  Flaggers, gravel surface.
S-201  Work on this project is temporarily suspended.  When work  resumes please expect the following:  Approximately 10 to 20  miles west of Jct of MT-16.  Shoulder work in progress.  
S-203  Stevensville north.  Chip sealing work in progress.  Expect  loose gravel, reduced speed to 35 mph, single lane traffic.   Work will begin on Wednesday, May 16, 2012.
S-205 OLD  HIGHWAY 10
Work on this project is temporarily suspended.  When work  resumes please expect the following:  Logan to 1/2 mile east  of Manhattan.  Chip sealing work in progress.  Expect delays  of 15 to 15 minutes, fresh oil, loose gravel, reduced speed  varying from 25 to 35 mph, pilot cars, gravel surface, single lane traffic, single lane closures, flaggers.
S-205 OLD  HIGHWAY 10
Work on this project is temporarily suspended.  When work  resumes please expect the following:  One half mile east of  Logan at the JCT with I-90 East to Manhattan.  Overlay work  in progress.  Expect delays of 15 to 25 minutes, fresh oil,  loose gravel, reduced speed varying from 25 to 35 mph, pilot  cars, single lane traffic.
S-205  East of Manhattan.  Reconstruction work in progress.  Expect  delays of 15 to 15 minutes, reduced speed to 35 mph, pilot  cars, single lane traffic, single lane closures, traffic  controlled by signal lights.  Grading, Shoulder, clearing and grubbing, topsoil .  Traffic speeds reduced to  35 mph and  possible flagger set ups throughout the week.
S-205  Work on this project is temporarily suspended.  When work  resumes please expect the following:  S-205 West of Belgrade.  Milling work in progress.    Winter shutdown.
S-211  5 miles west of Ronan.  Miscellaneous work in progress.   Expect reduced speed to 35 mph, rough roadway surface.
S-213  Cut Bank Railroad Overpass.  Bridge work in progress.  Expect reduced speed to 35 mph.
S-223  South of Chester.  Chip sealing work in progress.  Expect  pilot cars.
S-227  This project has been completed.   South of Centerville.   Guardrail work in progress.  
S-235  Work on this project is temporarily suspended.  When work  resumes please expect the following:  West section of Valley  Center Road from Jackrabbit Lane continuing to the junction  with Love Lane.  Miscellaneous work in progress.    Winter  Shutdown.
S-236  Clagget Hill - Fergus County Gravel Road north of Winifred,  MT.  Seeding work in progress.    ROAD IS OPEN. Contractor  will be continuing miscellaneous work, with no restrictions  to travelers.
S-241  Work on this project is temporarily suspended.  When work  resumes please expect the following:  Harlem.  Chip sealing  work in progress.    Work scheduled to resume in the spring.
S-257  Work on this project is temporarily suspended.  When work  resumes please expect the following:  Southeast of Superior  on the Diamond Match Road.  Miscellaneous work in progress.  
S-271  Work on this project is temporarily suspended.  When work  resumes please expect the following:  Two miles east of  Drummond.  Striping work in progress.    No work in progress.  Work scheduled to resume in the spring.
S-279  Work on this project is temporarily suspended.  When work  resumes please expect the following:  North of Helena -  Lincoln Road West.  Chip sealing work in progress.    Chip  seal scheduled the summer of 2012.
S-284  This project has been completed.  S-284 - Canal Access Road-  East of Helena.  Miscellaneous work in progress.    This  project is complete.
S-284  S-284 East side of Canyon Ferry Lake, north of Townsend.   Crack sealing work in progress.  Expect delays of 10 to 10  minutes, reduced speed to 35 mph, pilot cars, single lane  traffic, flaggers.  Grading, culvert installation, fencing  and topsoil.
S-288  CHURCHILL ROAD
Work on this project is temporarily suspended.  When work  resumes please expect the following:  Intersection with I-90  to 6 miles south of I-90.  Chip sealing work in progress.   Expect delays of 15 to 15 minutes, fresh oil, loose gravel,  reduced speed varying from 25 to 35 mph, pilot cars, gravel  surface, single lane traffic, single lane closures, flaggers.
S-298  Secondary 298
South of McLeod Slide Repair, 24.5 miles south of Big Timber  in Sweet Grass County.  Reconstruction work in progress.   Expect detour, reduced speed to 25 mph, single lane traffic,  flaggers.
 Frontage Road NE of Hysham
Work on this project is temporarily suspended.  When work  resumes please expect the following:  Frontage Road NE of  Hysham.  Chip sealing work in progress.    Inactive until  chip seal.
S-317  Work on this project is temporarily suspended.  When work  resumes please expect the following:  On Conrad Drive at  intersection with Anderson Lane and Shady Lane.  Chip sealing work in progress.    This project is complete except for chip seal operations to be scheduled in 2012.
S-331  Castner Street extending across Belt Creek to the  Interstection of Bridge Street and Main Street.  Guardrail  work in progress.  Expect delays of 15 to 15 minutes, reduced speed to 15 mph, flaggers.
S-347  Work on this project is temporarily suspended.  When work  resumes please expect the following:  West of Belgrade -  Amsterdam Road Drainage Bridge.  Bridge work in progress.   Expect road closure.  The roadway will remain closed until  the completion of the project.
S-411  SPRINGHILL  ROAD
Work on this project is temporarily suspended.  When work  resumes please expect the following:  6 TO 10 miles north of  the N 19th Ave Interchange.  Chip sealing work in progress.   Expect delays of 15 to 15 minutes, fresh oil, loose gravel,  reduced speed varying from 25 to 35 mph, pilot cars, gravel  surface, rough roadway surface, single lane traffic, single  lane closures, flaggers.
S-426 Hanover  Road
11.2 miles NW of Lewistown near the Judith River on Hanover  Road.  Miscellaneous work in progress.  Expect detour,  reduced speed to 25 mph.  A road slide at mile post 15.5 has  closed a short segment of this roadway.  A 2.8 gravel detour  is in place around the slide with a speed restriction on the  detour.
S-430  Work on this project is temporarily suspended.  When work  resumes please expect the following:  Canyon Ferry Road.   Chip sealing work in progress.    The project includes bridge removal and culvert replacement.
S-430  Work on this project is temporarily suspended.  When work  resumes please expect the following:  Intersection of Canyon  Ferry Road and Spokane Creek Road (S-284).  Miscellaneous  work in progress.    Project is in winter shutdown.
S-447  6.5 miles south of Rosebud.  Culvert installation work in  progress.  Expect delays up to 10 minutes, detour, loose  gravel, reduced speed to 35 mph.
S-453  This project has been completed.  S-453 Lincoln Road.  Paving work in progress.    Work is complete except for some seeding and fence work which will not affect the travelling public.
S-472  Blue Slide Road -near Thompson Falls.  Fencing work in  progress.  Expect reduced speed to 35 mph, single lane  traffic.
S-482  Work on this project is temporarily suspended.  When work  resumes please expect the following:  Farm to Market Road,  Libby.  Bridge work in progress.  
S-548  West Reserve Drive from US93 east to Stillwater River Bridge.  Intersection work in progress.  There is a width restriction of 12 feet.  Expect detour, reduced speed to 35 mph, traffic  controlled by signal lights, flaggers.  Project involves  building a new road from West Reserve Drive south and then  west, connecting up with Hutton Ranch Road.  Work will  involve traffic revisions to West Reserve between US93 east  to the Stillwater River Bridge.  The North Approach to Home  Depot will be CLOSED through Friday, May 11, 2012.  West  Reserve traffic is detoured to the south part of the road and has a 12' width restriction through the month of June, 2012.  After paving is complete on Wednesday, May 16, 2012, the  traffic detour will be moved to the north half of the road.   Expected completion is late July, 2012.
S-540 EAST  RIVER ROAD
Work on this project is temporarily suspended.  When work  resumes please expect the following:  6 miles north of Pray  near Strawberry Creek extending 5 miles north to Pine Creek.  Overlay work in progress.  There is a width restriction of 10 feet.  Expect delays of 15 to 15 minutes, fresh oil, loose  gravel, reduced speed to 35 mph, pilot cars, rough roadway  surface, single lane traffic, grooved surface, flaggers.   This project is scheduled to start on Monday, May 21, 2012.
US-12  This project has been completed.  Helena - Capitol  Interchange.  Miscellaneous work in progress.    This project is complete.
US-12  Work on this project is temporarily suspended.  When work  resumes please expect the following:  Approximately 22 miles  east of Townsend in Deep Creek Canyon.  Culvert installation  work in progress.  Expect delays of 25 to 30 minutes, loose  gravel, reduced speed to 35 mph, gravel surface, single lane  traffic, traffic controlled by signal lights.
US-12  Between Checkerboard and Martinsdale on Primary 14 (US-12).   Topsoil work in progress.    Watch for trucks entering the  roadway.  May be some minor traffic delays.
US-12  Seven miles east of Junction of US 191 / US 12 in Harlowton.  Reconstruction work in progress.  There is a width  restriction of 12 feet.  Expect delays up to 10 minutes,  detour, loose gravel, reduced speed to 35 mph, pilot cars,  single lane traffic, traffic controlled by signal lights,  flaggers.  This reconstruction project begins seven miles  east of Harlowton, and ends half a mile west of Shawmut, MT.  A width restriction of twelve feet on the detour areas.   Crews will be working 24 hours a day, travelers should watch  for equipment flaggers and workers in the roadway.
US-12  Concurrent  with MT-3
1 mile north east of Cushman at the junction of Cushman Rd  and US 12.  Bridge work in progress.  Expect detour, loose  gravel, reduced speed to 25 mph, gravel surface.  The DETOUR  bridge is now OPEN.  The contractor will be on site working  on the NEW bridge.
US-12  This project has been completed.  Roundup Rockfall Repair -  Three miles west of Roundup, MT on US 12.  Miscellaneous work in progress.    Maintenance Crews will finish the plant mix  resurfacing at a later date.
US-12  Project begins approximately 13 miles east of Melstone, for  10 miles.  Overlay work in progress.  There is a width  restriction of 11 feet.  Expect delays up to 15 minutes,  reduced speed to 35 mph, pilot cars, single lane traffic,  single lane closures, grooved surface, flaggers.  Width  restriction of 11 feet will be in place on this overlay  project during actual days and hours of paving.
US-12  Beginning at Forsyth running 12 miles northwest.   Reconstruction work in progress.  There is a width  restriction of 14 feet.  Expect delays up to 15 minutes,  detour, loose gravel, reduced speed to 35 mph, pilot cars,  gravel surface, single lane traffic, traffic controlled by  signal lights, flaggers, motorcycles consider another route.  14 foot width restriction for work on the Yellowstone River  Bridge.
US-191  9.9 miles North of West Yellowstone.  Bridge work in  progress.  Expect reduced speed to 45 mph.  Shoulder work.   Grayling Creek Bridge is open.
US-191  Big Sky North.  Bridge work in progress.  There is a width  restriction of 10 feet.  Expect reduced speed to 25 mph,  pilot cars, single lane traffic, single lane closures,  traffic controlled by signal lights.  Grooved surfaces with  uneven lanes, sign installation,milling and paving. Width  restriction will end Thursday, May 24th, 2012.  24 Hour/day  width restrictions on loads over 10' wide. Milling and paving will not continue until Tuesday, May 29th, 2012.. Work will  be in progress from 7:00 am to 7:00 pm Monday through Friday. Travelers could possibly see occasional work in progress on  Saturdays if needed.NO WORK WILL BE IN PROGRESS FRIDAY, MAY  25TH THROUGH MONDAY, MAY 28TH. There will be no traffic  control during this time but travelers should expect reduced  speeds.  Paving is scheduled to be finished in approximately  two weeks, weather depending then chip seal will follow.
US-191  Gallatin River Bridge to Four Corners.  Shoulder work in  progress.  Expect reduced speed to 35 mph.  Sign  installation.  Work will be in progress from 7:00 am to 7:00  pm Monday through Friday. Travelers could possibly see  occasional work in progress on Saturdays if needed. NO WORK  IN PROGRESS FRIDAY AFTERNOON, MAY 25TH, THROUGH MONDAY, MAY  28TH.  Travelers should expect reduced speeds.
US-191  Work on this project is temporarily suspended.  When work  resumes please expect the following:  Sixteen miles south of  Bozeman.  Chip sealing work in progress.  
US-191  Work on this project is temporarily suspended.  When work  resumes please expect the following:  Huffine Lane - Four  Corners to 19th.  Sign installation work in progress.  Expect reduced speed to 35 mph.
US-191  Work on this project is temporarily suspended.  When work  resumes please expect the following:  Huffine Lane & Cobb  Hill Signal.  Sign installation work in progress.  Expect  reduced speed to 35 mph, single lane closures, intersection  work.
US-191  This project has been completed.  Lewistown, MT fourteen  miles north to Hilger, MT.  Overlay work in progress.  Expect delays up to 15 minutes, reduced speed to 35 mph, grooved  surface, flaggers.  Milling is complete, roadway is paved.   Crews are now only working on paving pullouts with minimal  delays.  WIDTH RESTRICTION has been lifted.
US-191  Work on this project is temporarily suspended.  When work  resumes please expect the following:  Warm Springs Creek  Bridge, ten miles north of Lewistown.  Bridge work in  progress.    Bridge is open with no travel restrictions or  detours.
US-191  Slides- 3 miles south of Missouri River (Fred Robinson)  Bridge.  Reconstruction work in progress.  There is a width  restriction of 12 feet, a weight restriction of 8 tons.   Expect delays up to 15 minutes, loose gravel, reduced speed  to 35 mph, rough roadway surface, single lane traffic, single lane closures, traffic controlled by signal lights, flaggers.  Slide repair. No overweight loads are allowed until repairs  are finished. Expect uneven spots in pavement due to slide  movement, a width restriction of twelve feet throughout this  project.  NO overweight loads allowed on this route until  project is complete.
US-2  Work on this project is temporarily suspended.  When work  resumes please expect the following:  McGregor Lake to 3  miles east of Marion.  Chip sealing work in progress.    This project is in winter shut down.  Chip Sealing will be done in 2012.
US-2 West  Idaho Street
WEST IDAHO STREET (Downtown Kalispell) from Meridian to 1st  Avenue West North.  Paving work in progress.  There is a  width restriction of 12 feet.  Expect detour, loose gravel,  intersection work, traffic controlled by signal lights,  flaggers.  The South side of the highway is closed.  Traffic  is detoured to the North half of the highway and reduced to  one lane each direction.  NO LEFT TURNS are allowed in the  work zone.  Concrete paving continues. Expect flaggers  stopping traffic for concrete trucks and equipment entering  and exiting the work zone.  Project will include: Milling,  Pulverizing, Grading, Shoulder work, Culvert installation,  Intersection work, Sign installation, Paving, Landscaping,  and Seeding.  Estimated completion date is June 25, 2012.   Expect intermittent side road closures on the South side of  the highway.
US-2  Work on this project is temporarily suspended.  When work  resumes please expect the following:  Columbia Falls, 1 mile  east of Jct MT40 at Hilltop Road.  Signal installation work  in progress.  
US-2  COLUMBIA FALLS between 6th Avenue and Nucleus Avenue.   Intersection work in progress.  Expect fresh oil, loose  gravel, rough roadway surface, single lane closures, grooved  surface, intersection work, flaggers.  Intersection work  continues.  Project includes: signal heads, sidewalk, curb  and gutter, signing, milling, paving, chip seal, and pavement markings.  Completion is expected on or about July 15, 2012.
US-2  Work on this project is temporarily suspended.  When work  resumes please expect the following:  Nyack Flats, 8 mi East  of West Glacier.  Chip sealing work in progress.  Expect  fresh oil, loose gravel, reduced speed to 35 mph, pilot cars, single lane traffic, flaggers.  Chip sealing operations have  been suspended due to weather.  Chip seal work is expected to be completed the same day.  Crews will sweep the loose gravel the following day and striping will follow shortly  thereafter.  The new work schedule will be published as soon  as it has been determined.
US-2  Java to Devil Creek, seven to thirteen miles west of Marias  Pass.  Guardrail work in progress.  Expect reduced speed to  35 mph, single lane traffic, flaggers.  Guardrail operations  are underway.  Crews will be removing old guardrail and then  installing new guardrail.  Work is expected to be completed  on Thursday, May 24, 2012.
US-2  Work on this project is temporarily suspended.  When work  resumes please expect the following:  Approximately 10 miles  east of Essex.  Surveying work in progress.  
US-2  Work on this project is temporarily suspended.  When work  resumes please expect the following:  Marias Pass - West.   Chip sealing work in progress.    Chip Seal to resume in the  spring.
US-2  Work on this project is temporarily suspended.  When work  resumes please expect the following:  Marias Pass - East.   Chip sealing work in progress.    This project is located on  top of Marias Pass and extends 6.2 miles east towards East  Glacier. The contractor will perform seal and cover  operations next year.
US-2  Work on this project is temporarily suspended.  When work  resumes please expect the following:  East Glacier - west.   Miscellaneous work in progress.  
US-2  East Glacier to Browning.  Milling work in progress.  Expect  reduced speed to 35 mph, pilot cars.
US-2  East Glacier - Two Medicine River Bridge.  Bridge work in  progress.  Expect reduced speed to 35 mph.
US-2  6.5 Miles Southeast of Cut Bank.  Miscellaneous work in  progress.  Expect reduced speed to 55 mph.
US-2  Work on this project is temporarily suspended.  When work  resumes please expect the following:  West of Cut Bank.   Crack sealing work in progress.  Expect delays of 10 to 15  minutes, reduced speed to 35 mph, pilot cars, single lane  traffic, flaggers.
US-2  US 2 West of Havre in Hill County.  Rock work in progress.   Expect reduced speed to 35 mph, single lane traffic, road  closure, flaggers.  There will be one-lane, two-way traffic  on US 2 between the hours of 6:30 AM to 8:30 AM and 3:30 PM  to 6:00 PM. A detour using 82nd Ave West will be in place at  other times during the day and during blast operations and  cleanup.
US-2  Work on this project is temporarily suspended.  When work  resumes please expect the following:  Approximately three  miles east of Havre continuing seven miles east.   Miscellaneous work in progress.    Located on US Hwy 2 in  Hill and Blaine counties. There are currently no delays.
US-2  7.3 miles West of Frazer to 1 mile East of Frazer.  Paving  work in progress.  Expect delays up to 15 minutes, pilot  cars, traffic controlled by signal lights, flaggers.
US-2  Brockton-East.  Reconstruction work in progress.  There is a  width restriction of 12 feet.  Expect delays up to 15  minutes, loose gravel, reduced speed to 35 mph, pilot cars,  gravel surface, rough roadway surface, single lane traffic,  traffic controlled by signal lights, motorcycles consider  another route.
US-2  5  to 12 miles west of Culbertson.  Reconstruction work in  progress.  Expect delays up to 10 minutes, reduced speed to  35 mph.  Shoulder work with minimal delays.
US-212  Work on this project is temporarily suspended.  When work  resumes please expect the following:  9 miles east of Lame  Deer.  Miscellaneous work in progress.    Road open to all  truck traffic.
US-287  Work on this project is temporarily suspended.  When work  resumes please expect the following:  South of Harrison.   Miscellaneous work in progress.    No work until final  striping.
US-287  This project has been completed.  South of Toston.   Miscellaneous work in progress.    Project is complete.
US-287  Northwest of Three Forks.  Reconstruction work in progress.   There is a width restriction of 11 feet.  Expect reduced  speed to 45 mph.  Bridge work, median work, and fencing.  Passing lanes east and west bound on I-90 will be closed one  mile east and west of the west Three Forks interchange.   There will be single lane traffic through this area with  reduced speed of 55 mph.Width restrictions on loads over 11  feet wide, Wide loads northbound on US 287 must use the East  Three Forks Interchange to cross I-90.  Wide loads southbound on US 287 must use Mulligan Canyon Interchange to cross I-90.
US-287  concurrent  with US 12
South of Townsend.  Bridge work in progress.  Expect detour,  reduced speed to 35 mph, pilot cars, single lane closures,  flaggers.  Fencing and topsoil.  Grading and culvert  installation. Clearing and Grubbing.
US-287  Work on this project is temporarily suspended.  When work  resumes please expect the following:  South of Townsend.   Fencing work in progress.    No work at this time.
US-287  Work on this project is temporarily suspended.  When work  resumes please expect the following:  Augusta-NE.   Miscellaneous work in progress.  
US-287  North of Augusta - Choteau.  Chip sealing work in progress.    No work this week. The contractor is waiting to perform seal and cover operations.
US-87  Work on this project is temporarily suspended.  When work  resumes please expect the following:  38th St. South at 10th  Ave South - Great Falls.  Sidewalk work in progress.    Work  on this project is shut down until spring.
US-87  Work on this project is temporarily suspended.  When work  resumes please expect the following:  West of Lewistown-  Intersection with US-87 and Cottonwood Creek Road.   Miscellaneous work in progress.  There is a width restriction of 10 feet.  Expect delays up to 5 minutes, single lane  closures, flaggers.  Installation of traffic sensors.  OVERSIZED LOADS may want to choose an alternate route but can be accommodated but delay could be up to 1 hour. Work  scheduled to begin on May 10th at 10:00 am to 4:00 pm.
US-87  Work on this project is temporarily suspended.  When work  resumes please expect the following:  6th Avenue North to  Bench Boulevard-Billings.  Striping work in progress.  Expect single lane closures.
 US-89 Work on this project is temporarily suspended.  When work  resumes please expect the following:  Livingston - Park  Street.  Bridge work in progress.    Project shutdown.
US-89  Work on this project is temporarily suspended.  When work  resumes please expect the following:  Yellowstone River  Bridge six miles northeast of Livingston.  Guardrail work in  progress.  Expect single lane closures.
US-89  Concurrent  with US-87/MT- 200
Work on this project is temporarily suspended.  When work  resumes please expect the following:  East of Great Falls  continuing approximately 5 miles west to the junction with S- 227/ S-228 (Mehmke Hill).  Miscellaneous work in progress.    Project is in winter shut down.
US-89  Work on this project is temporarily suspended.  When work  resumes please expect the following:   Kiowa JCT - Hudson Bay Divide.  Miscellaneous work in progress.    Winter shutdown.
US-93  Work on this project is temporarily suspended.  When work  resumes please expect the following:  Two miles north of  Woodside to one mile south of Victor.  Miscellaneous work in  progress.  
US-93  Work on this project is temporarily suspended.  When work  resumes please expect the following:  South of Lolo.   Miscellaneous work in progress.  
US-93  Work on this project is temporarily suspended.  When work  resumes please expect the following:  US-93 and I-90  interchange area north of Missoula.  Miscellaneous work in  progress.  
US-93  Work on this project is temporarily suspended.  When work  resumes please expect the following:  In Missoula at the  intersection of Reserve Street and Mullan Road.  Intersection work in progress.  
US-93  Work on this project is temporarily suspended.  When work  resumes please expect the following:  One mile South of  Lakeside at Blacktail Road.  Miscellaneous work in progress. 
US-93  Work on this project is temporarily suspended.  When work  resumes please expect the following:  South of Somers.   Surveying work in progress.  
US-93  Work on this project is temporarily suspended.  When work  resumes please expect the following:  South of Whitefish at  Jct MT40.  Chip sealing work in progress.    Chip Seal to be  scheduled in 2012.
US-93  Downtown Whitefish.  Reconstruction work in progress.  Expect delays up to 15 minutes, detour, road closure.  The extensive City of Whitefish reconstruction project continues.  The  signed detour route via Baker Avenue and 13th Street West  will be in operation through Friday, May 25, 2012.  Expect  heavy congestion and delays.  Travelers should consider an  alternate route.