image for Toston Missouri River study
· Study Description
· Schedule
· Data & Figures
· Documents/Newsletters
· FAQs
· Related Links

Carol Strizich
MDT Project Manager
2960 Prospect Ave
P.O. Box 201001
Helena, MT 59620-1001
406.444.9240


Jeff Ebert
MDT Butte Administrator
3751 Wynne
P.O. Box 3068
Butte, MT 59702-3068
406.494.9600


Jeff Key, P.E.
CDM Project Manager
406.441.1400


Gail Vennes
Broadwater County Commission
PO Box 489
Townsend, MT 59644
406.266.9203

Data & Figures

This map shows the study area via an aerial photograph for the Toston Missouri River Crossing Corridor Planning Study. The graphic shows the beginning and ending termini of the project along U.S. Highway 287.

Project Study Area
 
Title Figure
Surface Waters and Floodplain 3-1
Irrigation Systems 3-2
Cultural Resources and Recreation 3-3
Wildlife Corridor Areas 3-4
Animal Species of Concern 3-5
Potential Wetlands 3-7
Land Use 3-8
Hazardous Material in the Project Study Area 3-9
Farmland and Soils 3-10
Geology 3-11
Weighted Overlay Results 7-2
Possible Corridor Areas 7-5
West Corridor Area 7-6
Central Corridor Area 7-7
East Corridor Area 7-8