Click here for mt.gov - Montana's Official Website

Montana Department of Transportation

HIGHWAY CONTRACTORS
Latest Updates | Bid History
Contractor/Bidding Information
Trnsport Electronic Bidding Info
Letting Info/Q & A Forum
Prequalified Specialty Contractors
Projects - Awarded | Upcoming

DESIGN CONSULTANTS
Consultant Services Procedures
Prequalification Roster
Recently Selected Consultants
Upcoming Projects

SUPPLIES/SERVICES PURCHASING
Invitation for Bid - Purchasing
   -Bidding Procedure

GENERAL INFORMATION
FAQs | Design Build
Debarred Bidders - Fed | MT
Forms | Manuals | Software
Qualified - Products | Technicians

CIVIL RIGHTS PROGRAMS
ADA | DBE | EEO/LABOR | Title VI

BRIDGE DESIGN
Bridge Management System
Design Standards

ENVIRONMENTAL
Air/Noise | Hazardous Materials
Cultural Resources |Wetlands
Storm Sewer System Permits

PLANS/DESIGN
CADD Info | Project Templates
Road Design Project Guidelines

SPECIFICATIONS
Contractor Submittals
Detailed Drawings
Standard Specifications
Special Provisions | Supplements

REPORTS/MEMOS/MINUTES
Archived Reports
Avg Fuel & Asphalt Prices
Memos - Construction | Design
Reports
MCA-MDT Tech Committee Minutes
Producer Requirements to QPL

Overview
Effective Date: June 2005
This Specification governs the Qualified Products Lists (QPL) for materials used by the Montana Department of Transportation (MDT), and describes qualification procedures, quality monitoring requirements, disqualification, along with sampling and testing.

Qualification Procedures
Prospective producers interested in submitting their product for QPL qualification should submit an e-mail to or a written request to: Montana Department of Transportation, Materials Bureau, Quality Control Section, P.O. Box 201001, Helena, Montana, 59620-1001, Include the proper forms with the request. The various forms are:
  • Request Form


  • Due to the signature requirement, the following should be filled in, printed and mailed to the address above.

  • Extension Form
  • Product Name Change Form
  • Product Location or Company Name Change Form
After receiving the request form or extension form and QC plan MDT will contact the producer. When appropriate, samples will be requested.

In order to be qualified the product must have been in production for at least 6 months.

Submit the following
  • Request Form
  • The producer must provide a copy of the producer's quality control plan for this product to MDT. This plan must show that their quality control (QC) facilities actively participate in the QC of the product.
MDT will place the acceptable material on the QPL after confirming the material meets specifications and there is an adequate QC plan in place for product productions.

Once a product is listed in the QPL, any change in formulation, manufacturing process, or manufacturing location must be reported to MDT on the appropriate forms. Any changes in the material require resubmission for requalification.

Quality Monitoring Requirements
Follow the QC plan for all QPL listed products supplied to MDT.

Quality Control Test Report
The MDT requires all producers listed on the QPL perform quality control (QC) testing on their material showing it meets requirements listed for the item in the Standard Specifications for Road and Bridge Construction and any corresponding supplement specifications. Testing is required for all materials qualified under the QPL. The test report must contain the following information:
  • Type of material
  • Date of manufacture
  • Product identification number
  • Quality monitoring test results
Producers must maintain a complete record of all test reports for the previous two years and current calendar year.

Random Testing and Auditing
The MDT reserves the right to sample materials on the QPL for testing and to perform audits of test reports. MDT representatives may sample material from the manufacturing plant, the project site, or other locations. MDT reserves the right to test samples to verify compliance with Standard Specifications for Road and Bridge Construction and corresponding supplement specifications.

Disqualification
Products that do not perform or are found to be non-compliant with MDT specifications may be removed from the QPL at any time. These items will remain unlisted until adherence to the specifications can be verified and the product has undergone satisfactory performance evaluation.

Packaging and Labeling Requirements
Package the material in appropriate containers to protect the contents of the package while in transit and according to any applicable MDT specifications for that item. Labels must include the following information:
  • name of manufacturer
  • brand name
  • Type of material
  • unique product identification number
  • date of manufacture
Click here for MT.gov
  • Cameras, Roads & Weather
  • Maps
  • Contracting/Consulting
  • Privacy & Security
  • Accessibility
  • Contact Us