Highway 35

Bridge work, chip seal, and striping to be completed this spring. Please use caution in the workzone.


Doug Moeller
MDT Missoula District Admin
2100 W Broadway
PO Box 7039
Missoula, MT 59801-7039
406.523.5800


Billy Maart
MDT Project Manager
Victor, MT
406.642.9526


CJ Beardsley
LS Jensen
4685 Mullan Road
Missoula, MT 59808
406.532.4809 (direct) 406.728.1400 (main office)

Highway 93 Bell Crossing N & S - Victor Urban - North

US 93 Bell Crossing is a rehabilitation project between milepost 60 and milepost 62 in Ravalli County. The project includes the following major components:
  1. Irrigation/Drain Culvert Installation
  2. Wildlife Crossing
  3. Big Creek Bridge Work
  4. Pavement Pulverization and Grading
  5. Aggregate and Asphalt Paving Surfacing ~ Highway and Bike Path
  6. Guardrail; Rumble Strips; Cattle Guards; Fencing
  7. Pavement markings; Tree and Shrub Planting; Topsoil & Seeding