Case Study 2
Construction plans shows SS-6 on a side slope that
was intended to be disturbed during the end of the
construction process.  Due to construction timing the
Contractor will be re-disturbing the slope in less then
14 days.  The contractor would like to use SS-12.
 Is this acceptable?