Completed Bid Package including Erosion
and Sedimentation Control Plan Sheets
and Preliminary NOI Package
(SWPPP in NOI Package Utilizes Same
Plan Sheets)
n Incorporate erosion and sediment control plans into
construction plans package
n Incorporate NOI and SWPPP into construction
package