Preliminary Erosion and Sediment Control
Design Report, including Preliminary NOI
Package
n Vicinity map
n Delineation of potential erosion and sedimentation
areas
n Preliminary soil investigation
n Generate erosion and sediment control schedule
n Identification of existing control practices
n Prepare preliminary NOI package (NOI form and
SWPP)