Scheduling BMP (SS1)
Use
n Develop a schedule to sequence construction and BMP
implementation
n Limit the duration and size of area exposed
n Stabilize inactive areas as soon as possible (do not need
to wait until the end of the job)
n BMP implementation schedule needs to correspond with
the construction schedule