General Permit Part IV.  Storm Water
Pollution Prevention Plan (SWPPP)
n Operator shall develop a SWPPP and submit a copy
at the same time as the NOI form
n Operator shall implement the SWPPP at the time
construction activity commences
n Operator is responsible for  for ensuring SWPPP
requirements stated in the General Permit are
complied with