General Permit Part III.  Monitoring,
Reporting, Record Keeping
n All erosion and sediment control measures must be
inspected and maintained by the operator at least
once every 14 days and within 24 hours of any storm
event of 0.5 inches or greater
n DEQ must be notified in writing within 2 days of the
detection of any significant spill or release
n Copy of SWPPP must be available on-site
n Uncontrolled releases must be documented